Tuesday, September 6, 2016

August

After a wonderful few days in San Antonio, it is back to work. 

Here is a nice shot with tarps removed.  We have spent a lot of time pumping rainwater out of the boat lately.  The bow rail is finished.

 Chocks installed.
Helm is taking shape.  Real seat bases are under construction.
 Two 25 gallon water tanks arrived today
It is starting to really come together.
.

June and July

Here is picture of the bow rail in progress.  John used 1" aluminum pipe, bent and rolled to fit

 Here is the anchoring hardware.  A roller, holder and king post.


April and May

Front window frames are fitted.  The center one will open for ventilation.
This is the underside of the hatch for the front deck.  It needs to be large enough to climb out to handle anchoring.  Lower photo shows how he used square tubing to fit the hatch onto a curved deck.
 Our handy pipe bender is making a new canopy of the Bronco.  We are tired of the old one blowing apart in every bad storm.  John got a deal on rectangular steel tubing from our good friends at ALRO metals.

February and March

Dawn's shoulder is healing and it's time for her to post all the work that has been done.  The finished cabin top is being raised so that the hull can go underneath.

Top is installed and a perfect fit.

All of the side window framing and track was milled from Starboard.  Corners were drawn using a Corelle plate from the kitchen.  Bottom photo is a trial fit of the frame.