| Engine starting battery under the step. |
| Inverter and port inverter battery under frame for helm seat. |
| Galley counter with AC outlet. You can see LED dome light in celing of head.. Yes, there will be a wall between head and galley. |
| Engine starting battery under the step. |
| Inverter and port inverter battery under frame for helm seat. |
| Galley counter with AC outlet. You can see LED dome light in celing of head.. Yes, there will be a wall between head and galley. |
| All of the instruments need to be wired to the senders on the engine. Not shown are the AC and DC switches panels. |
| Extra battery under the step on right and a better look at the engine. |
| Other trinkets like cleats and the fuel fill are in place. |
| After - old sewing room connects to new room. |
| Before - old sewing room. |
| 75% of the addition. The second set of french doors from pool room and the east end are cut off. |
| Final stage was fitting and securing storm shutters. Paver path is also newly reconfigured. |