Taking a rest with the storage canvas in place.
Sunday, July 14, 2024
It's been almost five years since our last post. However, the boat is still coming along. Medical issues and Hurricane Ian slowed or sidelined the project. Most of the plumbing and electrical wiring us in place.
Building the "down the road" trailer required construction of a gantry to lift the bow end of the boat off the temporary "building" trailer for the swap.
Our friend Sherry made a beautiful blue bimini top for the cockpit, the mattresses and the dinette cushions. They are all stored safely in the house. Photos someday.
The cockpit stays covered under the overhang behind the shop.
The cockpit stays covered under the overhang behind the shop.
The new "down the road" trailer tires are now protected from the sun with custom covers made from an upcycled tent canopy.
Sunday, October 13, 2019
More progress
The MGB-GT is getting lots of wrench time but the boat is still moving along. We filled and bled the steering system last weekend:
| The rag is red from ATF leaks. |
| The galley is almost ready for formica, but leaving it bare makes a nice work area for now. Notice to the right that the head is in place on the base. Yes, there will be walls and a door. |
Sunday, April 28, 2019
More wiring and navigation equipment
Progress continuues-
| Messy cockpit but it is easier to work inside. Fortunately, there is a canopy overhead. |
| Top left- Electric current leak indicator - a must on an aluminum boat or any boat. Vented loop for bilge pump discharge. |
| TOP: Cabin lighting and VHF radio installed. BOTTOM: Back of starboard side helm area. John included a nice shelf for charts and the log book. |
| Wiring for helm instruments. |
Tuesday, October 9, 2018
Wiring for AC and DC power in progress.
| Engine starting battery under the step. |
| Inverter and port inverter battery under frame for helm seat. |
| Galley counter with AC outlet. You can see LED dome light in celing of head.. Yes, there will be a wall between head and galley. |
Monday, September 10, 2018
Now - Boat progress!
We call her Ally right now. That may change later. She has been painted for several months and has temporary plexiglass windows so she can be closed up and kept outside the shop. The permanent windows will be smoked not clear. The temporary windows can get paint overspray and sand blast damage.
| All of the instruments need to be wired to the senders on the engine. Not shown are the AC and DC switches panels. |
| Extra battery under the step on right and a better look at the engine. |
| Other trinkets like cleats and the fuel fill are in place. |
Why there have been no posts.....
The boat project and this writer have been sidetracked by adding an addition to the house for my sewing area.
We even unburied the pool table. John still uses one end for drafting but the board lifts off for easy access. Boat parts that need to be stored inside are under the table.
| After - old sewing room connects to new room. |
| Before - old sewing room. |
| 75% of the addition. The second set of french doors from pool room and the east end are cut off. |
Thursday, May 11, 2017
May 2017
We have been laying out the interior and measuring and measuring and measuring. This is the framework for the dinette that will convert to a bed. Since John has years of experience taking boats apart to replace tanks and other repairs, he is planning ahead. The port water tank will sit below the table and can be removed if needed.
It is easier to weld on the shop floor or on tables, so the center rear window frame had to be removed to get the dinette frame in and out.
It is easier to weld on the shop floor or on tables, so the center rear window frame had to be removed to get the dinette frame in and out.
| Removing the frame to finish welding. Only a half inch had to be cut off the legs. |
| Looking aft into the cockpit. There will be doors on both sides The engine is behind the dark gray foam pad. You can also see the white panels covering the cockpit wall ribs. |
February 2017
October to January 2017
![]() |
| Visiting the Tree Capital Museum in Perry Florida. |
| The cockpit deck hatches are finished and it's time to close up the stern. |
| Closed, but how does he get in and out? |
| John built a custom stairway on wheels. |
Tuesday, September 6, 2016
August
After a wonderful few days in San Antonio, it is back to work.
Here is a nice shot with tarps removed. We have spent a lot of time pumping rainwater out of the boat lately. The bow rail is finished.
Chocks installed.
Helm is taking shape. Real seat bases are under construction. Bar stools and pillows just won't work, LOL.
Two 25 gallon water tanks arrived today
Two 25 gallon water tanks arrived today
It is starting to really come together.
.
June and July
Here is picture of the bow rail in progress. John used 1" aluminum pipe, bent and rolled to fit
Here is the anchoring hardware. A roller, holder and king post.
Here is the anchoring hardware. A roller, holder and king post.
Subscribe to:
Posts (Atom)