We know some of you enjoyed the bird photos.
The lake is now level with the top of the dock. The wagon is permanently parked on the dock, why is a mystery.
There are still ducks swimming about, but most of the interesting birds have moved on.
| Here is a fiberboard mock up of the transom shape. |
![]() |
| Trail fitted T piece. |
![]() |
| The tunnel is coming along. In the foreground is a rudder that we found at Marine Surplus in Sarasota. It needs a bit of modification, but not much. |
![]() |
| Turning the boat around involves a trip around the yard. The water has receded back to the lake edge thanks to a few weeks with no rain. We do miss the birds. |
![]() |
| Two tarps suspended from the framework and wrapped around uprights make an extension to the shop. The tarp stops the wind while welding. |
![]() |
| Motor support in the foreground and another trial fit of the redesigned tunnel. |